
Site safety monitoring and inspections from cameras and drones.
- Inspections without exposure
- Alerts on change, not on schedule
Open pit and underground: equipment reliability, ventilation on demand, energy in grinding and pumping, and the safety and environmental monitoring around it.
Mining is shifting towards safer, greener and more efficient operations. Traditional methods carry significant safety risk, high operating cost and environmental pressure, and struggle to keep pace with modern demands.
SMHcoders uses AI-powered autonomy to make mining smarter, safer and more sustainable — from the pit and the underground face to the concentrator.
Feed changes ripple through the whole concentrator.
Every stopped hour is unrecoverable throughput.
Flotation runs below potential without live quality data.
Comminution dominates site energy use.
Computer vision, predictive analytics and live dashboards, applied where mines lose safety margin and money.

Site safety monitoring and inspections from cameras and drones.

Equipment health and energy optimisation from fleet and plant data.

Airflow matched to where people and machines actually are — lower energy, safer air.

Real-time production visibility from mine to mill, with tailored automation end to end.
The same plant, the same people — the difference is what the data does between the lab, the control room and the work order.
Every solution in our Mining brochure. Where one runs on a product or solution we deliver, it links there — the rest are scoped as engagements on the same delivery stack.
“Ore changes by the hour. Your grinding circuit should change with it.”
In your industry · SMHcoders
With one measurable use case — most often a soft sensor or an equipment-health model on a unit that matters. Small scope, visible payoff, then scale.
Yes. Scoping and commissioning happen at your site in the Gulf region; model development runs in-house with our own engineering team.
Most engagements start with 6–24 months of historian, lab or document data. We audit coverage in the first week and tell you plainly if it is not enough — before you commit.
On your infrastructure — plant-side servers, your Azure or AWS tenancy, or an air-gapped network. Data never leaves your boundary, and nothing is used to train third-party models.
Yes — 45 minutes with an engineer, a feasibility read and suggested next steps. No obligation.